sábado, 20 de marzo de 2010

TERMINATION TYPE FINAL IDEA OF ROBOT

With the above ideasm it fits one of the predesigned systems in order to increase strength in this. And he used parts of other systems previously considered to unify the physical idea of building the robot.
You work when it was found that different key available allen had been damaged and was causing damage to the screw heads allen, and local hardware stores and by the time they found those keys available.
The final ideas was established for the physical construction of the robot, even with the unknowns of the actual field to determine whether we use conventional wheels. And the weekend to continue working with the knowledge of programming software for the robot controller.
On Tuesday 23 March 2010 were working full time to develop the idea of the car by changing the settings on the need for more engines and adjusted to the low number of gears for the transmission of motion.

viernes, 19 de marzo de 2010

OTHER DESIGN

Now come on March 19, feast of San Jose, the construction work of three alternatives to operate the robot in respect to the system sending the ball to the oppsite field, simulatin a ball to score.
When the afternoon had access to constest the ball (small) found that systems developed no lorger work effectively with these new balls because of their weight.

jueves, 18 de marzo de 2010

IDEAS OF SOLUTION OF TROLLEY

Today Thursday, 18 March 2010 were will be testing different desing possibilities of robot parts to meet the challenge.

miércoles, 17 de marzo de 2010

CONSTRUCTION OF THE FIRST PROTOTYPE ROBOT

March 17th today our team has the challenge of building the first prototype of the robot basic technical aspects of design serving as the center of gravity, the support polygon, stability, careful with the cables. And verification of the microcontroller in respect

martes, 16 de marzo de 2010

BASIC TRAINING PROGRAM PLC 16 March 2010


At this time the training is being conducted in relation to the basic programming for the PLC DESING KIT ROBOTICS SYSTEM, and which provides participants that our team is version 5.


Where there have been general information for participants of the challenge, general elements of the kit, and began to develop very basic situations to program using the VEX kit.

lunes, 15 de marzo de 2010

PREPARING FOR ROBOT CAR TYPE

On 15 March 2010 were carried out by the construction of te car type, prior to the training program.

domingo, 14 de marzo de 2010

FIn de semana Votaciones

NO acceso a trabajar en los robots el fin de semana en instalaciones del Sena.